123456789101112

Operation No. 286

RAILHEAD AT K 7452

Over target: 1240 hrs 18 aircraft 72 aircrew

Operational Record

Target
Railhead at K 7452.
Duty
Medium level bombing attack on railhead at K 7452
Committed
18 Glenn Martin Baltimore
Time of attack
1240 hrs. L.T.
Airborne
0936 hrs
Returned
1130 hrs
From
El Djem Main
Map
TUNISIA 1:500,000 Sheet NJ.32. SE. TUNIS.
Day / night
Day
Casualties
Nil.
Bombing
Medium level bombing, from 7800/8000 ft. 108 x 250 lb. GP 43 Det. (Rods).
Air defences
Nil over target. Slight inaccurate LAA from KORBA and HAMMAMET.
Results
Three S/E (single engine) A/C (aircraft) on beach EAST of KORBA. Two S/E A/C on KORBA NORTH on NE and NW corners. Less than 10 MT on main coast road NORTH and SOUTH of KORBA.
Bombs from Nos. 1 & 3 boxes burst across the marshalling yards, where there were approx. 20 trucks. One small fire was started. No. 2 Box bombed to the WEST of the railway line, a few bursts being seen among some buildings SW of the target. Direct hits were scored on the railway line and on the road and railway crossing. There were near misses on trucks and station buildings. Row of 30 trucks seen on the line at the NORTH end of the station. No engine and no movement seen.

8,000ft.

Aircraft and crews