APPENDIX "R"
201
TO : H.Q. MAAF (attention 23rd SCORU)
H.Q. NATAF (attention 2nd Command Unit 23rd SCORU)
SAOA SAAF
FROM : SIO 21 SQUADRON SAAF
REF : 21S/634
DATE : 17th April 44
OPREP No.634 for period ending 2100 Hrs on 16/4/44
REF MAP ITALY 1:100,000 Sheet 131 FOLIGNO
12 Balts detailed to carry out a repeat attack on an AMMO DUMP near
SPOLETO at A901593 with a mixed load of delay and instantaneous 500 lb
bombs. Formation airborne at 1627 Hrs and after R/V with a close escort
of 8 Mustangs at PENNA POINT, set course at 1709 Hrs via Mt SIRENTE. Two
boxes bombed independently on respective leaders. All bombs of one a/c
hung-up and was brought back. First box overshot from A905594 to 907599.
Second box's first bomb D/H on building in SOUTH corner. One D/H
on each of two large buildings followed by fires on NORTH edge of in
railway siding. D/H on road beyond. All a/c back by 1853 Hrs. NO enemy
opposition. Visibility good, but hazy; target area clear, 10/10 cloud
at 18000'
B: (i) 2 Balt 111A
(ii) NIL
(i) 7 Balts 1V
(ii) NIL
(i) 4 Balts V
(ii) NIL
C: NIL
D: (i) 2.20 Hrs
(ii) NIL
(i) 16.20 Hrs
(ii) NIL
(i) 9.20 Hrs
(ii) NIL
E: (i) 3200 x .30
300 x .303
700 x .50
(ii) & (iii) NIL
(i) 22400 x .30
2100 x .303
4900 x .50
(ii) & (iii) NIL
(i) 12800 x .30
1200 x .303
2800 x .50
(ii) & (iii) NIL
F: (i) 4 x 500 MC
(ii) As above
(iii) & (iv) NIL
(i) 28 x 500 MC
(ii) As above
(iii) & (iv) NIL
(i) 16 x 500 MC
(ii) 12 x 500 MC
(iii) (iv) NIL
FUSING : 36 49 Det 27 Pist NOSE - 49 Det 28 TAIL
12 52 Det 37 Pist TAIL - 6 & 12 Hour Delay
to V: NIL
W: (i) 2 Balts 111, 1 Balt 1V (ii) NIL
X: (i) 2.20 Hrs. 1.00 Hr (ii) NIL
Y & Z: NIL.
S.L. Boshoff
Capt.
SIO 21 Squadron, S.A.A.F.
APPENDIX "R"
201
TO : H.Q. MAAF (attention 23rd SCORU)
H.Q. NATAF (attention 2nd Command Unit 23rd SCORU)
SAOA SAAF
FROM : SIO 21 SQUADRON SAAF
REF : 21S/634
DATE : 17th April 44
OPREP No.634 for period ending 2100 Hrs on 16/4/44
REF MAP ITALY 1:100,000 Sheet 131 FOLIGNO
12 Balts detailed to carry out a repeat attack on an AMMO DUMP near
SPOLETO at A901593 with a mixed load of delay and instantane…