123456789101112

Operation No. 135

100 M.T. ALONG ROAD FROM POINT V1825 TO NOFILIA L.G

Over target: 1310 hrs 12 aircraft 48 aircrew

Operational Record

Target
100 M.T. along road from point V1825 to NOFILIA L.G.
Duty
100 M.T. along Main Road from point V1825 hours to NOFILIA L.G.
Committed
12 Glenn Martin Baltimore
Time of attack
From 1310 to 1313 hours.
Airborne
0840 hrs
Returned
1120 hrs
From
Solluch
Map
1/500,000 Agheilia - Marada Sheet 11/20
Day / night
Day
Casualties
Nil.
Bombing
Medium level bombing attack from 9/8000 ft. 71 x 250 (Rods) G.P. 43 det. (One hang up jettisoned into Sea).
Air defences
Four heavy guns fired spasmodically and inaccurately from NOFILIA L.G. area.
Results
In area V1020 approximately 100 M.T. well dispersed. No movement seen on Road East from Bombing point. Bridge at V2812 appears to have been damaged or destroyed.
The formation attacked in line astern and observers bombed individually. Bombs were dropped from V1825 and along the Northern side of the road to NOFILIA L.G. Quite a number of bombs were observed to burst among M.T., but no immediate fires resulted. The transport well dispersed.

8,000ft.

Aircraft and crews