123456789101112

Operation No. 128

DUMPS AT 853310 AND GHAZAL STATION

Over target: 0842 hrs 18 aircraft 72 aircrew

Operational Record

Target
Dumps at 853310 and GHAZAL station
Duty
Dumps at 853310 and GHAZAL Station.
Committed
18 Glenn Martin Baltimore
Time of attack
0842 hours B.
Airborne
0441 hrs
Returned
0626 hrs
From
L.G. 98
Map
1:250000 El Daba Sheet 14
Day / night
Day
Casualties
A/C 958 W., Lt. Metcalfe force landed on beach at 485925 (Alexandria 1:250,000) Sgt. Kerr (R.A.F.) sustained injuries.
Bombing
Medium level bombing from 9500 ft. 102 x 250 lbs. (Rods) G.P. Det. 43
Air defences
Light inaccurate A/A coming from the area N.W. of station was seen to burst below the formation.
Results
About 500 M.T. dispersed on either side of main road between Grid 85 and Grid 86. Fair concentration above 847314. Dug-in positions in target area. Battle in progress 855295 numerous fires seen in this area. Two unidentified fighter aircraft seen to dive down together and then an explosion on ground area 880285 at 0855 hours.
It was expected that some of the dumps would still be burning after a night attack, but the formation saw no smoke on arrival and the weight of the attack was directed against dumps, M.T. and tents at 853309. Bombs were seen to burst across the station and a building started to burn. Two direct hits were scored on M.T. and one on the railway track. Two columns of white and one column of black smoke was observed after leaving the target. One bomb burst caused an explosion. Observation was difficult due to cloud over target.

9,500ft.

Aircraft and crews